Larger openings formed in a controlled sequence
Loads remain properly supported
We use temporary support before the original wall is disturbed.
Steelwork fits the planned opening
We prepare sound bearings and install support to the required design.
The next trades get a clear start
We make good around the opening ready for later installation work.
Create space without compromising support
Removing a wall can join rooms and improve movement, but the loads above still need somewhere safe to go. Our load bearing wall removal work in Blackburn begins by reviewing the proposed opening, the existing construction and the required support. We plan temporary propping, prepare the masonry and install steelwork to the appropriate design. Internal openings and larger external openings need different treatment, particularly where weather protection and the outer elevation are affected.


Take the alteration from propping to making good
A structural opening works best when every stage is planned in order. We establish access, protect the work area and support the structure before controlled removal begins. Once the steel and bearings are in place, we rebuild around the opening and make good ready for following trades or finishes. External openings can be formed up to five metres where the project design allows. For Blackburn projects, we can connect the alteration with wider open-plan or kitchen reconfiguration work.
Frequently asked questions
Can any load-bearing wall be removed?
Not automatically. The construction, loads, opening size and available bearings must be reviewed first. We base the alteration on the appropriate structural design and practical site conditions.
What is different about forming an external opening?
An external opening affects support, weather protection and the finished elevation. Access and temporary exposure also need planning, especially when the opening is intended for large doors.
Do you make good after installing the steel?
Yes, making good can form part of the agreed scope. We rebuild and prepare the area around the new opening so it is ready for the next trade or specified finish.